




EVM 1TB NVMe M.2 SSD
Highlights:
- Form Factor M.2 NVMe
- Interface Pcle Gen 3×4
- Shock resistance 1500G/0.5ms
- MTBF 2,000,000 hours
0% OFF
₹5,334M.R.P.: ₹5,334
Only 1 items left!
Don't miss it
Description
Features
- Form Factor M.2 NVMe
- Interface Pcle Gen 3×4
- Shock resistance 1500G/0.5ms
- MTBF 2,000,000 hours
- Performance Read (max.) Sequential Read: up to 2300MB/s
- Performance Write (max) Sequential Write: up to 1800MB/s
- Storage Temperature -40C to 85C
- Operating Temperature 0C to 70C
- Dimensions 80mm x 22mm x 3.75mm
Overview :
Designed for tech enthusiasts, hardcore gamers, and professionals who need unrivaled performance
NVMe PCIe interface marks the next step in storage innovation
User-friendly tools help keep your drive up to date, monitor drive health, speed, and even boost performance.
We use the most reliable and advance micron 3D NAND TLC chips.
NVMe Standard Self-Monitoring and Reporting Technology (Smart)
To ensure the utmost level, SSDs undergo rigorous testing at all stages of production, including tests for vibration, temperature and humidity, speed, and functionality
- FAST: NVMe SSD with speeds up to 3x faster than SATA SSDs and up to 50x faster than traditional HDDs; sequential read/write speeds up to 2,300/1,800 MB/s
- RESPONSIVE: Upgrade your PC for more efficient downloads, installs, and multitasking
- VERSATILE: Slim M.2 NVMe form factor and multiple capacity options up to 2TB make for easy upgrades
- RELIABLE: Enjoy peace of mind with 2M-hours MTBF, a limited 5-year warranty.
- AFFORDABLE: Cost-effective solution for building an efficient system or upgrading your PC and laptop.
- Boost your system’s performance with next-gen NVMe SSDs.
Over 3 times faster than our SATA SSDs.
Attribute | Value |
---|---|
Brand | EVM SSD |
Capacity | 1 TB |
Interface | NVMe PCI-e |
Max Sequential Read | Up to 2300 MBps |
Max Sequential Write | Up to 1800 MBps |
User Type | Consumer SSD |
Warranty | 5 Years |