




EVM-512-SATA
Highlights:
- Part Number EVM25/512GB
- Life expectancy of 1 million hours MTBF
- Form Factor 2.5 Inch SATA
- Interface SATA 3.0 Gb/s SATA 6.0 Gb/s
Only 6 items left!
Don't miss it
Description
High-performance storage
Upgrade your computer's storage with EVM India's 512GB SSD 2.5 Inch SATA Internal Solid State Drive for high-speed and reliable performance. With impressive sequential read speeds of up to 500MB/s and write speeds of up to 340MB/s, you can experience faster boot-up and load times for your computer.
Energy-efficient design
Our SSD features low power consumption of only 0.195W idle and 0.279W average, making it an energy-efficient choice for your computer. It has a maximum power consumption of 1.535W during read and write operations, ensuring that your computer runs efficiently.
Durable and long-lasting
Our SSD is designed for durability, with a storage temperature range of -40°C to 85°C and an operating temperature range of 0°C to 70°C. This means that it can withstand harsh environments and perform reliably for a long time.
Power your old system
Our SSD comes with a 2.5 Inch form factor and SATA interface of 3.0 Gb/s and 6.0 Gb/s, upgrade your computer's storage today and enjoy improved performance and reliability.
At EVM, we offer a hassle-free solution if you encounter any issues with your device. With our pickup and drop service, we'll collect your device from your doorstep and return it to you fully repaired or replaced with a new one. You can rest assured that we've got you covered!
| Attribute | Value |
|---|---|
| Brand | EVM |
| Series | 512 GB |
| Colour | Black |
| Form Factor | 2.5-inch |
| Item Height | 14 Millimeters |
| Item Width | 12.9 Centimeters |
| Product Dimensions | 9.9 x 12.9 x 1.4 cm; 20 g |
| Item model number | EVM25/512GB |
| Hard Disk Description | Solid State Drive |
| Hard Drive Interface | Solid State |
| Hardware Platform | PC |
| Are Batteries Included | No |
| Included Components | 1 Solid Safe Drive |
| Item Weight | 39 g |
| Warranty | 5 Years |